Appendix B
2.4-meter Telescope Shutdown Checklist

If lightning or severe storms threaten, please follow the Lightning Shutdown Procedure after stowing the telescope.

Telescope

Telescope Control System

MIS (xmis2) and Guider PC (Slit Viewer PC if used)

Dome

Computers and Instrumentation

Primary Mirror Air Conditioning System

Reports and Requests

Conserve Energy!


< Prev (Startup Checklist) Table of Contents Next (Main Index) >

Updated: 2014Feb14 (Galayda/MDM)